Our Picture Gallery
click images to enlarge
|

Cranes under construction for U.S.
Army Depot
|

Crane installation in Greensburg,
IN |

Recent installation of two double
girder cranes at Letterkenny Army Depot.
|

Our special "in house" design
lifting beam allows us to raise the completed crane in one pick. |

Recent load test using customer
supplied 174,000# weights.
|

The new variable frequency drives
installed by Valley Industrial Crane worked flawlessly. |
 |
 |
|
We recently installed ASCE rail with
conductor bar in (4) 500' and (1) 220' runways in Southwest KY.
Included was the installation of (10) 57' span cranes.
|
 |
 |
|
Valley Industrial Crane recently
completed another project at Benson Trailer in Kentucky. Three
special design double girder, twin hook cranes were installed to
handle long components. |
 |
A recent project for Dayton Manufacturing included fabrication and
erection
of a complete 10 ton system. |
|
Click images below to enlarge |
 |
 |
A runway installation project in an
operating yacht manufacturer in North Carolina. While working over
employees and $2M boats, dropping even a bolt was not an option.
|
 |
 |
|
Two 20 ton double girder cranes
recently installed in Greenup, Kentucky were designed with limited
clearance for rigging. A large end loader was used to assist in the
positioning of the girders.
|
 |
 |
|
Valley recently installed ASCE rail,
mainline and two cranes (30 & 10 ton) at a precast concrete plant in
Tipton, Indiana. |
Finishing up an installation of a 15
ton double girder crane at a plastic molder in Monroe, Ohio |
 |
 |
New installation of 10 ton 74' span "monobox" crane with ASCE rail and
conductor bar in Lexington, KY.
|
 |
 |
|
Valley Industrial
Crane was hired to remove a 30/10 ton double box girder crane that
had recently been heavily damaged. It was fortunate that the damaged
girder did not completely fail. We are now quoting the installation
of a new 30 ton crane.
|
 |
 |
 |
 |
|
Installation has been completed on
the 150/70 metric ton crane for a local press manufacturer. The
crane has an 82' span and weighs 145,000 lbs. |
 |
 |
|
The picture shows our technicians
finishing up the installation of a 33 ton, 80' span crane at a large
steel processor in South Bend, IN. |
Valley just completed the
installation of a system in Erlanger, KY. that consisted of columns,
runway beams, ASCE rail, mainline conductors and (2) 5 ton cranes. |
 |
 |
|
Valley Industrial Crane installing a long span monobox crane
for a steel fabrication company in Bardstown , KY.
|
Valley technicians completing the installation of a crane
system extension in Miamisburg, OH. |
 |
 |
|
The second phase of the project at Alstom Corp. included the
installation of 5, 15 and 40 ton cranes with a complete runway
system. 100,000 lbs. was used for the final load test. |
 |
 |
|
The 2nd Alstom phase also included electrical start up of the new
cranes. Valley techs shortened an existing 10 ton crane and
installed it on the new runway. |
Valley installed patented track underhung runway and cranes at two
Government installations. The projects were in Ft. Campbell, KY and
Union City, TN. |
 |
 |
|
The second building section is being added to ABSKY in Danville,
KY. 10 and 1 ton cranes were assembled on site and lifted over the
exposed wall to the new runway.
|
 |
 |
|
The 30 ton free standing crane system installation pictured above
was completed by Valley at an auto parts manufacturer in Bowling
Green, KY. |
 |
 |
 |
 |
|
Free standing crane systems and 10 new cranes were installed at the
new HINO Motors facility in Williamstown, WV. Valley also inspected,
repaired and load tested two existing 10 ton double girder cranes at
the plant.
|
 |
 |
|
Benson Trailer (Cadiz, KY) keeps growing and Valley Industrial
Crane is once again called upon to install new overhead cranes.
|
 |
Valley Industrial Crane built and
installed a bridge with vacuum lifter to move sheets of steel on to
a series of burning tables.
The bridge, (2) electric chain hoists
and Anver vacuum lifter are all controlled by an IKUSI radio. The
radio control allows the operator to stay clear of the sharp edges
of the sheet steel.
Valley also fabricated and installed
the runway system at the Dayton, Ohio facility. |